McHenry Solar PV Plant

RET Capital’s McHenry Solar PV Plant in Modesto, California, has a 25-year contract to provide power to the Modesto Irrigation District, an investment-grade utility that provides electric service and irrigation water and treats surface water for drinking. With a capacity of 25 megawatts, McHenry produces more than 66,000 MWh of clean solar energy a year. RET Capital acquired the project in 2014, closing a favorable refinancing of bank/bank hybrid senior debt with Nord/LB and Babson Capital.

Industrial photography of solar facility

McHenry Solar PV Plant

Modesto, CA, United States

Details

Location Stanislaus County, CA
Asset Type Solar
Est. Annual Production 66,000 MWh
System Size 25 MW
Seller K Road Power

All Assets →